Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•
Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•
A blank brick gable, three storeys of it, six metres south of the boundary and belonging to someone else. That is the thing that decides this scheme. Everything else on the site — the slope, the limes, the ditch, the queue of traffic at the junction — arranges itself around that gable, and the job of the analysis is to work out how, in writing, before anyone draws a plan.
So here is one plot carried the whole way: the half-day on site, the desk work afterwards and what each source was actually for, a table converting every surviving finding into a design consequence with a dimension attached, the massing that falls out of it, and the findings that turned out to be decoration and got cut. The site is a composite — a teaching plot built from the kind of thing you'll actually be handed — but the reasoning chain is the real one.
The plot. Twenty-two metres wide, fifty-five deep. A lane along the north edge with two-storey cottages opposite. A converted grain barn, three storeys, sitting six metres beyond the south boundary with four north-facing flat windows in it. A row of mature limes down the east boundary. An open ditch and a public footpath along the west. Ground falling roughly 1.2m from the lane down to the south end. Brief: a one-off house, single family, modest budget.
Go with the drawing in your hand, not afterwards. Print the survey at a size you can write on, take a tape, and record things with times against them, because a site at 09:40 on a Tuesday is a different site at 15:00 on a Sunday.
What got written down, more or less verbatim:
09:35. Traffic queued back from the junction past the whole frontage. Engine noise at the north boundary, continuous. Headlights would sweep the frontage in winter.
09:50. Barn gable in full shade; our southern third of the site in shade too. Two of the four flat windows had blinds half down. Somebody was at the kitchen one.
10:10. A gate in the north-west corner that the survey shows as a fence. Worn path through it, no padlock, bin wheeled through while I stood there.
10:25. Ditch dry. Silt line about 200mm up the bank, so it runs sometimes. Cracked clay in the base.
10:40. Limes: one has a cut branch stub, recent. Leaf litter and ivy across a five-metre strip — nothing will grow under them.
11:00. Stood where the kitchen "should" go, on the south edge. Looked up. Gable fills the view. Looked at the flat windows. They look straight back.
11:20. Photos, every elevation, with a 1m rule leaning against something in each one.
That last one matters more than it sounds. Photographs without a known dimension in them are holiday snaps. With a rule in shot you can scale a wall height off a photo three weeks later when you can't be bothered to drive back.
Also: measure three or four things you already have on the survey. Not to be thorough — to calibrate. If the survey's fence-to-fence agrees with your tape, you can trust the rest of it. If it doesn't, you've just saved yourself a scheme.
Six Sources, One Question Each
Desk work goes wrong when you collect rather than ask. Give each source a single question and write the answer in a sentence. If you can't phrase the question, you don't need the source.
Ordnance Survey base mapping — what is the actual geometry of everything I can't measure? Useful for the barn footprint and the cottage frontages. It showed an outbuilding in the south-east corner that no longer exists. Site 1, desk 0.
Land Registry title plan — where does my ownership stop? The red line included a three-metre strip along the north-west that I'd assumed was the neighbour's. It also didn't mention the gate. Title says it's ours; the worn path says somebody has been using it for years. Those are two different questions and only a solicitor answers the second one. Theirs said: possible prescriptive right, resolve it before you design over it.
The council's planning portal — what has this officer already refused on this street? Three applications within six doors, all turned down, all citing two-storey development on the lane frontage and its effect on the street scene. That's not a rule. It's a stated position, and it's free.
The tree officer, by phone — are the limes protected? Yes, by virtue of the conservation area, and he'd want a survey. Five-minute call, saved a fortnight.
An arboriculturist — give me root protection areas as a CAD layer, and tell me what's constructible at the edge of them. That's the whole brief. A BS 5837 survey turns the trees from a vague green blob into circles you can plot, and circles you can plot are negotiable in a way that blobs never are. Don't estimate the RPAs yourself. You'll be wrong in whichever direction suits your plan.
A shadow study — where does the barn's shade actually land, and when? Any of the standard modelling tools will do this in twenty minutes; you need the barn's height and your latitude, nothing else. For this plot the model put the midday shadow about 14m into the site in late March, and about 5m in late June.
That fourteen-metre line is the single most useful number in the whole exercise, and it is the one a sun-path diagram pinned to a board will never give you. Students misread sun paths constantly — not because the diagram is wrong, but because it describes an empty flat field. Your site is not an empty flat field. It has a three-storey obstruction on the exact side the sun comes from.
When Two Findings Pull Opposite Ways
South light says glaze the south elevation. The flat windows say don't. The shadow study says there's no low sun down there to glaze for anyway. Three findings, one wall, and the generic checklist gives you no way to rank them.
The way we teach it: sort findings by what you can't buy your way out of.
Legal and immovable. Title, rights of way, easements, protected trees, listed fabric. You cannot design these away. They set the shape of the buildable area before anything else gets a vote.
Physical and expensive. Levels, drainage outfall, ground conditions, access width. You can change these, and each change has a price you can roughly name.
Performance. Sun, shade, noise, privacy, overlooking. These are solved by arrangement — they decide where things sit within the shape the first two gave you.
Preference. Views, aspect, character, the thing you saw on a precedent board. Last. Genuinely last.
Conflicts only ever resolve downwards. A tier-one finding beats a tier-three finding every time, and if you find yourself arguing the other way, you've stopped analysing and started defending a sketch you already made.
The Conversion Table
This is the part the checklists skip. A finding is not analysis. A finding plus a consequence, with a dimension in it, is analysis.
Finding
What it actually means
Consequence for the scheme
FindingThree-storey barn, 6m south, four north-facing windows
What it actually meansMutual overlooking at first and second floor across the whole south end
Consequence for the schemeNo habitable glazing on the south elevation. Build to the boundary as a blank wall rather than setting back from it
FindingShadow study: 14m in March, 5m in June
What it actually meansThe southern quarter of the plot has no usable ground-level sun for half the year
Consequence for the schemeCourtyard moves off the south edge and into the north-west quadrant — against instinct, with the model to prove it
FindingTitle includes the 3m north-west strip; gate in daily use
What it actually meansPossible prescriptive right of way; unresolved
Consequence for the schemeNothing built over it. Vehicle access and turning head stay on that strip and the solicitor goes first
FindingLimes, protected, RPAs plotted by the arboriculturist
What it actually meansA 5–6m strip of the east boundary is out
Consequence for the schemeBuildable width drops from 22m to about 14m. East wing sits hard on the RPA line, no-dig build-up
FindingDitch and drainage easement, west boundary
What it actually means3m no-build strip, but a surface water outfall you don't have to invent
Consequence for the schemeLevels strategy falls west. Soakaway question closed early
FindingGround falls 1.2m lane to south boundary
What it actually meansSurface water runs towards a neighbour's wall
Consequence for the schemeFFL set off the lane, cut into the slope, intercept channel before the south boundary
FindingTraffic queue and headlight sweep on the north frontage
What it actually meansThe only street-facing elevation is also the noisiest
Consequence for the schemeServant zone — stores, utility, bathrooms, entry — lines the lane. Living space faces the courtyard
FindingThree refusals on the street, all citing two-storey frontage
What it actually meansThe officer's position is already on record
Consequence for the schemeSingle storey to the lane; any first floor set back behind it
Eight rows. Each one finishes the sentence "therefore". If a row on your version can't, it isn't a finding, it's a photograph.
The Massing Falls Out
By the time the table is written, the massing is barely a design decision. It's arithmetic.
Twenty-two metres wide, less six for the root protection areas, less three for the drainage easement: thirteen metres of buildable width. The south boundary is a wall, not a window, so the building goes to it — an L, with the long arm running north–south just clear of the limes and a short return across the south end. The blank return solves the overlooking in both directions at once; the neighbours get a wall instead of our kitchen, and we get a wall instead of their blinds.
That leaves the courtyard in the north-west quadrant, which is exactly where the shadow study said the sun lands. Enclosed on the east by the house, on the south by the return, on the west by a garden wall that also deals with the footpath. Living space opens into it. The lane elevation is the back of the house pretending to be the front — entry, stores, a utility and one window — which suits the noise and suits the officer.
The two-storey element was the only real argument. Habit puts it at the rear, away from the street. But our own first floor at the south boundary would throw its shadow north into the courtyard we just spent the whole analysis locating. So it goes to the north-east corner instead, where its shadow falls onto the lane and into the lime canopy — set back six metres from the frontage so the street still reads single storey. Two findings that looked unrelated, resolved in one move.
South light still arrives. Not through a wall, through the roof: a clerestory on the east wing, above the barn's shadow line. If you want to get this onto a board so it reads in four seconds, that's a different skill and we've written it up in turning site analysis findings into diagrams.
The Cut Pile
Four things were researched properly and then thrown away, and saying so out loud is part of the method.
The wind rose. Taken from an airport some distance away, showing prevailing south-westerlies. The site is enclosed on three sides by a barn, a tree line and a hedge. Whatever the regional data says, the microclimate here is a bowl. Deleted.
The historic maps. The plot was an orchard, then a market garden. Genuinely interesting, zero consequence — nothing in the massing moved because of it. It survived as one line in the design and access statement and nowhere else.
Views. There is one. It is of a car park. The analysis sheet that would have had a view cone on it got replaced by a shadow diagram, which earned its space.
Footfall on the lane. Counted, logged, charted. The building is a private house with one front door. The count changed nothing.
Cutting is not failure. A site analysis that keeps everything is a site analysis nobody can act on, including you in three weeks' time.
How Long Any of This Should Take
For a one-off house like this, as a rule of thumb: half a day on site, a day at the desk, half a day drawing it up. Plus whatever the arboriculturist charges, which on a site with protected trees is not optional and should be in the fee proposal from the start, not absorbed later out of embarrassment.
Scale down and you drop the specialists, not the thinking — a rear extension still needs the shadow test and the title plan. Scale up and the pattern holds; there are just more consultants, each briefed the same way: one question, one deliverable, in a format you can plot.
You're finished when every surviving sheet can finish the sentence "therefore" with a dimension. Not when you've covered the categories. Covering the categories is how you end up with a beautiful analysis and a scheme that would have looked exactly the same without it.