Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•
Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•Black Friday•30% off annual plans•Win an iPad + Apple Pencil•Ends in --d --:--:--•
Leave the fee calculator closed. You cannot price a conversation about "a kitchen extension, maybe a loft, we'll see" — not because you lack a formula, but because there is nothing yet to put into it. A fee is a function of scope, and scope does not exist until somebody writes it down. That somebody is you, and the raw material is the first meeting.
So stop treating that meeting as a charm offensive. It is evidence-gathering. Everything you fail to ask on the sofa with the tea going cold becomes, nine months later, a thing you are doing for free at eleven at night. The questions below are grouped not by topic but by what each answer protects you from — because that is the only reason to ask any of them.
See the Site First, Even If It's Only From the Pavement
The order matters more than anyone tells you. If you walk the site — or at minimum stand outside it, look down the side return, and check the planning history on the council's portal — before you sit down with the client, your questions change completely.
You stop asking "are there any access issues?" and start asking "the only route to the back is through the house, isn't it?" One is a form to fill in. The other is a question they cannot answer vaguely. What we've found is that clients answer specific questions honestly and general questions optimistically.
If the meeting has to come first because that is how the diary fell, say explicitly at the end: "I'll confirm all of this after I've seen the site, and some of it will change." That sentence costs nothing and buys you the right to revise.
The Budget Question That Isn't "What's Your Budget?"
Everyone tells you to ask for a range. Fine. The useful follow-ups are the ones that test whether the number is real.
Where did that figure come from? A neighbour's extension, a magazine, a mortgage offer, or a quantity surveyor are four entirely different levels of reliability. In practice the number a client quotes you is usually the one their friend paid three years ago, for a simpler build, before the materials market did what it did.
Is that the construction cost or the project cost? Then list what sits outside construction: professional fees, surveys, planning and building control charges, party wall awards, VAT where it applies, kitchens, bathrooms, furniture, landscaping, moving out, contingency. Watch their face. If the number was supposed to cover all of that, you have just learned the most important thing in the meeting.
At what figure would you stop? This is the one nobody asks. The ceiling is more useful to you than the target, because the ceiling tells you what you are designing towards when tender prices come back high. If they cannot name one, the budget is a wish, not a constraint.
What would you give up first? Loft before extension? Glazing before floor area? You are building the value hierarchy you will need at Stage 3 when something has to go.
Find the Person Who Isn't in the Room
Ask who else needs to be happy with this before anything is signed. Not "who's the decision-maker" — people answer that question wrong, generously, in front of their partner.
The absent party is almost always the expensive one. A spouse working abroad. A parent lending the deposit. A sibling who co-owns the house. An adult child with opinions about the kitchen. Each of them is a redesign loop you have not been paid for.
So: who signs the appointment, who pays the invoices, and will everyone whose approval matters attend the design presentations? Then write their names into the brief. If someone refuses to commit to attending, price the extra round, because you will be doing it twice.
Planning Risk Is Theirs. Design Risk Is Yours. Say It Out Loud.
This is the distinction that separates an architect's first meeting from a freelance graphic designer's, and almost nothing online covers it.
Design risk is yours. If the drawings are wrong, that is on you. Planning risk is not yours — a committee, a neighbour's objection, a conservation officer's opinion and an Article 4 direction are not within your control, and you must never let a client leave the first meeting believing otherwise.
Test their appetite directly:
Would you rather have the scheme you want with a real chance of refusal, or a smaller scheme that's close to certain?
If it's refused, do you want to appeal, resubmit, or stop?
Are you willing to pay for a pre-application enquiry?
Does the timescale survive a refusal and a resubmission?
A client who says "push it, I'll take the fight" is a different job from one who says "I just want it done by Christmas", and those two jobs have different fees. The second client will blame you for a refusal unless the brief records, in their own words, that they chose certainty.
And while you are there: word it as preparing and submitting an application, never as obtaining consent. You are engaged to exercise reasonable skill and care, not to guarantee a result. If you are unsure how your own policy treats outcome-based wording, that is a conversation to have with your broker before you send the appointment, not after.
The Site Will Send You a Bill Later
Site questions are where the money hides. Each one of these converts directly into either a consultant appointment, an exclusion, or a line in your fee.
Do you have the deeds, a title plan, or any existing drawings?
Has anyone measured the building? Is there a survey, and from when?
Which boundaries are yours? Any disputes, shared drives, rights of way?
How close is the proposed work to the neighbours' walls or boundaries — and have you spoken to them? (Party wall, and the answer is almost always "we're on good terms", which is not the same as served notice.)
Any trees on or near the site? Any with preservation orders?
Where does the drainage run? Any manholes in the garden?
Basement, sloping site, made ground, any history of movement or cracking?
Can a skip stand outside? Is there a parking permit zone?
Conservation area, listed, Article 4, within a flood zone?
You do not need to resolve any of these in the meeting. You need to know which ones exist, because each is a consultant the client has not budgeted for and currently assumes you are.
"So, What Do You Think You're Getting?"
Ask it exactly like that, then be quiet. The answer is the single most valuable thirty seconds of the meeting, because the client will describe the job they have imagined — and the gap between their description and your schedule of services is your entire exposure.
They will mention 3D views. Site visits during the build. "You'll be dealing with the builder, won't you?" Interior design. Picking the kitchen. Snagging. Somebody to shout at when the plasterer doesn't turn up.
Write all of it down verbatim. Then ask the counter-question: who do you expect to appoint the structural engineer, the measured survey, the party wall surveyor, the energy assessor, the principal designer under CDM? Clients do not know these roles exist. They find out when the invoices arrive, and they are furious with whoever didn't warn them.
Ask Why That Date
Not when — why. Baby due in May. Lease expiring. Grandparent moving in. House going on the market. A fixed-rate mortgage ending.
The driver tells you what the client will sacrifice when the programme slips, and something always slips. A baby is immovable and means they will cut scope to hold the date. A vague "it'd be nice before next summer" means they will cut the date to hold the scope. You cannot sequence a job sensibly without knowing which one you've got.
Write Down What They Said, Not What You Heard
Two columns on the page. Left: their words, verbatim, in quotation marks. Right: what that means you are doing, and what it costs.
Verbatim matters because "we'd like it to feel light" and "we want floor-to-ceiling glass across the back" sound similar in a meeting and are separated by about forty grand. Your paraphrase will drift towards the version you'd enjoy designing. Theirs won't drift at all — it's on the page in their own words, and six months later it is the thing you point at.
Photograph any sketch either of you does, date it, and email it to them the same day with a short summary. That email is your contemporaneous record, and it is worth more than your memory. While you are at it, mention early that concept sketches and drawings remain your copyright, licensed to them for the project — it is a thirty-second conversation on day one and an ugly one on day two hundred.
Turning the Notebook Into a Brief
Here is the conversion, and it is mechanical. Take every line in your left column and sort it into one of four buckets:
A deliverable. Something you will produce, at a named stage, in a named quantity. "Two design options at concept stage, presented as plans, sections and one sketch view."
An assumption. Something you are relying on being true and have not verified. "Assumes the existing drawings supplied by the client are accurate." Assumptions are the cheapest insurance you will ever write.
An exclusion. Everything they mentioned that you are not doing, named explicitly. Interior specification. Party wall surveyor's role. Site inspections beyond a stated number.
An open question for meeting two. Because there is always a meeting two, and anyone pricing a private house job off a single conversation is guessing.
Then hang the deliverables off the RIBA Plan of Work stages — the RIBA calls Stage 1 Preparation and Briefing precisely because this document is the output of it — and you have a brief with stage-by-stage deliverables rather than a wish list with an architect attached.
Send that brief back to the client before the fee. Ask them to confirm or correct it in writing. Their reply is the thing you price against, the thing your appointment refers to, and the thing you hold up when a new conservatory appears in a conversation at Stage 4. For how the resulting schedule should be written so it actually resists pressure, we've gone through that in detail in our piece on schedules of services and scope creep.
Three Answers That Mean You Walk or Re-Price
"We've already had an architect, it didn't work out." Ask what happened and listen for whether anything is ever their fault. Sometimes the previous architect genuinely was useless. Often you are about to become the next one. Either way, ask who owns the existing drawings, because you may not be allowed to use them. Re-price for the extra approval rounds, or decline.
"We don't want to get the surveys done until we know the planning works out." This is a client telling you they will not spend money on anything they cannot see. You will be designing on assumption, carrying the risk of every unverified dimension, and arguing about fee variations the moment the survey contradicts your drawings. Either they fund the surveys first or you write the assumptions so hard they sting.
"We just need the drawings to get it through planning — keep it cheap, the builder will sort out the rest." Translation: they intend to use your name on the application and then hand the detailing to whoever is cheapest, with your drawings. You carry the professional risk, they take the savings. That is a decline, or a very different appointment with explicit limits on what your drawings may be used for.
The Meeting Ends When the Document Starts
None of this makes you difficult. Clients who have just spent an hour being asked serious questions about money, risk and who actually decides things come away thinking they have hired a professional. The ones who get a fee by return of email on the strength of a chat come away thinking they have hired a quote.
Don't price the conversation. Price the document the conversation produced — and make sure the document is one you'd be happy to read aloud in a dispute.